However, we are hit with a small hiccup whereby they installed the wrong sink in the scullery. We wanted a bigger 62L sink but they installed the smaller 44L. To replace the sink, they will have to replace the entire scullery EssaStone benchtop. Sadly, the new benchtop cannot be re-used.This could delay us 1-2 weeks.
On a brighter note, we have engaged a painter to paint the house (after handover) and he has started by painting with undercoat sealer to the internal walls (Allowed by site supervisor). This will save us some time and he can start painting straight away once we have hand over.
Rear Alfresco
3rd garage roller door.
Master suite to WIR.
Living area all cleaned up
Yellowish paint on the wall is the painted sealer undercoat.
Wrong scullery sink, which means this whole stone top has to be replaced.
Mistake by the builder.