Sunday, May 29, 2016

Home Theater Riser

We have completed building the home theater riser platform.

There are 5 sub-sections (for ease of transportation to the new house) which will then be assembled, joined and secured together to form one complete riser platform. The 5th section will be assembled at the new house for accuracy of platform width, wall to wall.



4 sub-sections side by side.


With step up to platform (to be attached on site).


Fishbone supporting structure.




Wednesday, May 25, 2016

Ceiling Repairs

The roof inspection was carried out and look like some work was done to patch and fix the ceiling from the water leak last week.

We have not met with HH site supervisor and thus, we do not have the full report on the damage (if any) and what was done to the ceiling and roof space. We should be meeting our new site supervisor Tim this week as Walter has resigned from HH which is not quite a good news for us.


We just hope that Walter has fully handed over all the house details to Tim to follow through.


Tuesday, May 17, 2016

Practical Completion Inspection (PCI) - Cancelled

We were to meet up with Walter this morning for the house Practical Completion Inspection (PCI) where we will go through the entire house to check and identify any defects that will need to be fixed.

However, on our way to the house, Walter called and said that the PCI is cancelled as there is water leaking from the roof space onto the ceiling, dripping at the master ensuite entrance. Regardless, we went and were disappointed when we saw the puddle of water and water is still dripping.

Sunday, May 15, 2016

Finishing Fixtures

We are on the home run stage now where all electrical and appliances are installed and ready for inspection prior to handover.
The scullery sink and benchtop were finally replaced.

The Scullery sink.

Sunday, May 8, 2016

Flyscreen & Wardrobe Doors

We have the flyscreen installed to all sliding doors and windows, and the mirror + white kote glass doors were also fixed to the bedroom wardrobes.

They are going to fix the scullery sink this week and that will bring us very close to final inspection.