They are currently working on the front fascia and capping to the portico at the front entrance. They have also fixed the wall conduits to the correct wall and will patch up the defaulted wall.
There has been light rain over the weekend and the roof (just in time) did it's job in keeping the rain out of the house.
Plumbing works were also completed and they have sealed off the walls where the pipe runs. As for the electrical work, some minor work required as in fixing power plugs at the roof space and junction boxes.
The conduits are now fixed to the correct wall.
Cemented pipe grove to the kitchen sink.
Cemented kitchen cook top incoming gas line.
Master ensuite shower with 2 overhead shower plumbing done.
Bathroom and toilet vents to the roof.
Electrical wiring waiting for power plugs onto the roof space.
Pipes ready for gas hot water installation.
Roof capped at the joints, looking good.
More work at the front portico.