We went over today to visit and much to our surprise, they have started fixing colorbond onto the roof. We did not expect it to be this quick and looks like it is about 80% completed.

Plumbing for water and gas are also being installed.





In the master ensuite. Shower water pipe installed at the side.

Looking towards the rear

Rack roof covered

Yellow gas pipe for kitchen cooktop

Water pipe installed for kitchen sink.

Roof air vents to be installed.


External electrical for light and external power points



At the left is our house and neighbour's at the right

Neighbour's house brick work is almost completed.



Panorama view from the back