Thursday, January 21, 2016

Electrical & Plumbing

The roof structures are now done and they have also completed the eaves and fascia to all the sides of the house.

Hardiflex was used for the eaves and to cover the external rack ceiling and garage ceiling. Gutters and downpipes were also installed.

They have also started marking and cutting out grooves for the electrical wiring and plumbing pipes.

Front view


Rear view

Covered external rack ceiling, looks good.

Covered ceiling in alfresco




Markings in Kitchen

Master ensuite where the double sink will be installed

Master suite shower x 2

Kitchen cook top


Incoming fibre and networking cabling in Study room

Covered Garage ceiling


Looking into the 3rd garage

Gutters installed and ready for downpipes

Downpipes installed to the sides