Sunday, May 15, 2016

Finishing Fixtures

We are on the home run stage now where all electrical and appliances are installed and ready for inspection prior to handover.
The scullery sink and benchtop were finally replaced.

The Scullery sink.



Kitchen ovens, rangehood and gas cook top are installed.


Looking towards fridge space and walk in pantry + Scullery.

Lighting from the rack ceiling. They are also touching up on the rack ceiling joints (yellow lines).

Powder room ornamental leaf basin.

The powder room, complete with mirror fixture.

Front bathroom.


Master ensuite.



Karen by the ensuite sink with the mirror installed.


Hot water tank installed

Hot water tank and gas booster unit on the wall. Pipes and circuitry will be covered by panel.

2 hot water solar panels on the roof.


Front of the house is all cleared and levelled.


Front view of the house

Panorama view

No comments:

Post a Comment