Saturday, March 19, 2016

Essa Stone Top

This week, more work progress on the kitchen and bench tops with the installation of essa stone top. The laundry, bathroom and toilet floors were prep for floor tiling.



Scaffolding ready for installation of the rack ceiling frame and glass.

Rack ceiling frame.

Essa stone top to the kitchen.


Essa stone to the kitchen island.


Laundry floor ready for tiling.

Bricks at the passageway, due to construction of the bath tub supporting walls.

Essa stone top to the scullery.