They have fixed in the glass panels to the top of the rack ceiling after the triangular frame fixture.Tilers have begun tiling the laundry and wet areas flooring.
The garage slab was also laid down and looks good.








Rack ceiling glass panels were installed.


Downpipe and drainage were installed.


Floor tiles to the laundry.




Floor tiles to the toilet.


Our garage (right) side by side to our neighbour's.


Garage slab.



Front entrance and the garage.