Externally, painters are working on painting the front wall. We took this opportunity to look around the house and check on the kitchen, scullery and bathroom cabinets and sink wares.
Painting to the front walls.
In the study with baby Celeste sleeping.
Our Kitchen.
Compartment for dual ovens below the gas cook top.
Fridge space.
Karen by the kitchen island.
Scullery cabinets.
Tiles ready for installation.
Karen in the penguin room aka powder room.
Power room cabinets
Master Ensuite shower painted with water proofing (green).
Dual sinks in ensuite.
Front bathroom, waterproofing to the shower area.
Bath tub installed.


















No comments:
Post a Comment