We visited the house today and the doors were locked and secured. We  have reached lock up stage and the ongoing work will be mainly indoors for installation of cabinets, wet area tiling etc. They have also started installing the doors.

We will not be able to enter the house from today and could only peek in from the window.



Door fixed to master bedroom.

Dining and kitchen walls were all plastered.

Entrance to kitchen scullery.

Melamine boards delivered for cabinetry.

1 of 2 front door waiting for installation.

View into the lounge and living area. Doors to the home theatre at the left (green doors).